OIL TANK REMOVAL IN WESTMOUNT
Turnkey removal, from pumping to the compliance report | Underground and above-ground tanks | Residential and commercial | Westmount
A greystone in lower Westmount, a semi-detached house near Greene Avenue or a large home on the slopes of the summit? Incorporated in 1874 as Côte-Saint-Antoine, then renamed Westmount in 1895, the city has one of the oldest residential housing stocks on the island. Many homes here were heated with oil for decades before being converted to natural gas or electricity, and the original tank often stayed in the basement or buried in the yard. AIRE D3 Inc removes it from start to finish: pumping, excavation, dismantling, soil testing, decontamination if needed and a final report, with a single crew and a single point of contact.
Westmount is built on a slope, from the foot of the mountain up to the summit. Lots are narrow, houses are attached or semi-detached, and access is sometimes through a lane or up a staircase. After decades, the steel of a forgotten tank corrodes, and the oil that seeps into the ground can migrate downhill, toward the foundations and the neighbouring properties. A leaking underground tank often goes unnoticed for years, with no odour or trace at the surface. Meanwhile, the tank gets in the way of your plans: insurance refusals, delayed financing, a buyer demanding a soil test report, the risk of a latent defect claim.
Since 2023, the Regulation respecting oil-fired heating appliances (CQLR, c. Q-2, r. 1.1) prohibits replacing an oil-fired appliance with another fossil-fuel appliance in most residences, without setting a deadline for removing an existing tank. A tank that is no longer in use must nevertheless be emptied, cleaned and removed or decommissioned by a qualified contractor. In practice, it is the insurer, the mortgage lender and the buyer who demand complete removal, backed by a soil test report. Westmount also places great importance on protecting its architectural heritage: work affecting the exterior of a property, a tree or public property may require a permit or approval from the City. We check the requirements that apply to your property and handle the paperwork for you.
In the semi-detached and row houses of lower Westmount, the tank is often in a basement with tight access, at the bottom of a steep staircase. We empty it, degas it and cut it up on site so it can be carried out through the existing stairs or door without touching the structure, then check the slab and the surrounding soil if a leak is suspected. One day is usually enough.
In Westmount yards, which are often small and terraced, the tank is usually buried near the foundation, under a patio or behind a low wall. It has to be located, excavated, pumped out and extracted, and the soil from the excavation has to be tested, while protecting retaining walls, mature trees and neighbouring foundations. Shared foundations, narrow lanes and buried utilities call for careful planning and, when needed, shoring. If the tests reveal C10-C50 petroleum hydrocarbons above the applicable criteria, we carry on with decontamination: excavation of contaminated soil, in situ treatment when conditions allow, or a mixed approach. We assess first, then recommend the most sensible method for your property and your budget.
You have nothing to coordinate: permits, laboratory, hauling and disposal are all taken care of. A detailed quote is provided before the work begins, and you are informed immediately if the test results change the scope of the project.
The price depends on the type of tank, its depth, site access and the condition of the soil. An above-ground tank is removed for a fraction of the cost of a buried one, and a leak is what changes the bill the most. AIRE D3 Inc provides a detailed quote before the work and notifies you without delay if the tests change the scope of the project.
One day for an above-ground tank, one to two days for an underground tank with no contamination. You then need to allow for the laboratory turnaround before receiving the final report. If there is contamination, the duration depends on the volume of soil affected and the method chosen.
Yes, in the vast majority of cases. We adapt the equipment to the access: a mini-excavator, manual work when space is too tight, and shoring when a neighbouring foundation needs protecting. The preliminary visit lets us plan the job and give you a quote that takes these constraints into account.
Yes, if it is not documented. A well-advised buyer will ask for the removal report and the test results; without them, they will negotiate the price down or walk away. A documented removal before listing also protects the seller against a latent defect claim.
A fill pipe or vent coming out of the ground or the wall, an old furnace chimney or the words “oil heating” in the property documents are the most common clues. When doubt remains, we locate the tank on site before any excavation.
AIRE D3 Inc carries out turnkey removal of underground and above-ground tanks throughout Westmount, from the lower town up to the summit, with its own machinery and its own crews. A family business founded in 2011, recommended by CAA-Québec Habitation, holder of a Régie du bâtiment du Québec (RBQ) licence and covered by $2,000,000 in pollution insurance, it has completed more than 5,000 projects in Montreal, Laval, the South Shore and the North Shore. Call us at 514 900 3366 or request a quote.